Cost and timelines · 4 min read
Most marketing sites take a few weeks. The build is rarely the slow part. Copy, feedback and decisions are.
French Press Labs · Updated

The short answer
A typical small-business marketing site takes about 4 to 6 weeks from kickoff to launch when one team handles strategy, copy, design and build. Simple builder sites with finished copy can go live in days. Large sites with many service pages, custom features or slow approvals can take a few months. Writing and feedback set the pace.
In this article ›
What happens in each phase?
Most website projects follow the same five steps. The names vary. The work does not.
1. Discovery. The team learns your business: services, service area, customers, competitors, and what a good lead looks like. This is where the page list gets decided. A few days to a week.
2. Content and structure. The sitemap gets finalized and the copy gets written. For a service business, this means a page for each main service and area, plus the questions customers ask before they call. Often the longest step.
3. Design. Layouts for the key page types: home, service page, city page, contact. One or two rounds of feedback. About a week, sometimes more.
4. Build. Pages get built, forms and tracking get connected, and the site gets tested on phones. Speed, schema and titles get done here too. A week or two for most marketing sites.
5. Review and launch. You check everything, last fixes get made, the domain gets pointed, and old URLs get redirected so you keep what search value you had. A few days.
Some of these steps overlap. Design can start while the last pages are still being written.
Why does writing take the longest?
Because good copy needs knowledge only you have. Someone has to learn how you price, which jobs you want more of, what customers worry about, and which areas you actually cover.
A page that says "we offer quality HVAC services" can be written in minutes. A page that says what you install, which brands you service, what a typical replacement involves and which cities you cover takes interviews and drafts. The second page is the one that wins calls and gets quoted by AI assistants.
If you plan to write your own copy, give yourself more time than you think. Many DIY projects stall here for weeks.
What slows a project down?
Almost every delay comes from waiting, not from building. The usual causes:
- Copy that is not ready. The build cannot finish without words.
- Missing photos. Real photos of your team and work help, but someone has to take them.
- Slow feedback. A week of silence on a design round adds a week to launch.
- Too many reviewers. Each extra person adds opinions and time. Pick one decision maker.
- Access problems. Domain logins, hosting accounts, Google Business Profile access and old site credentials. Finding them early saves days.
- Scope added midway. "Can we also add booking?" is fair, but it moves the date.
How can you keep your project on schedule?
A few habits make a real difference.
- Name one decision maker. One person gives feedback and signs off.
- Gather access before kickoff. Domain, hosting, Google accounts, social profiles.
- Block time for feedback. Put review dates on your calendar when the schedule is set.
- Answer questions in full. A detailed answer once beats three rounds of follow-up.
- Launch the core first. Get the key pages live, then add the rest.
What affects the timeline for a service business site?
For trades and local service businesses, the page count is the big variable. A business with one service in one city needs a handful of pages. One with eight services across twenty cities needs a plan for many more, and each page should be useful on its own rather than a copy with the city name swapped. We cover that in city pages that don't get flagged as spam.
Integrations matter too. Online booking, call tracking, a CRM, or an AI receptionist each need setup and testing. Bilingual sites take extra time for proper translation and language tags.
How long does it take at French Press Labs?
A typical marketing site takes 4 to 6 weeks with us. We write the copy, design, build, and set up search groundwork and tracking in that window. Scope, price and timeline are fixed in writing before work starts. Website projects start from $25,000. See what a small-business website costs for how that compares.
Larger builds take longer, and we say so upfront rather than promising a date we cannot hit.
Is faster always better?
Not really. A site rushed live with thin pages often needs rework within months. A site that takes a few extra weeks to get the service pages right usually pays that back.
The better question is whether the timeline is honest. Ask any provider what happens each week, what they need from you and when, and what happens if you are late with feedback.
If you have a launch date in mind, tell us about it on our contact page and we will tell you whether it is realistic. You can also see how we approach websites.
Frequently asked questions
- Can a website be built in a week?
A simple site on a builder with finished copy and photos can go live in days. A custom site with written service pages, search groundwork and integrations takes longer, mostly because of writing and review time.
- What slows a website project down the most?
Waiting. Waiting for copy, photos, logins, feedback and decisions. The design and build steps are usually predictable. Slow approvals are not.
- Should I launch with every page finished?
Launch with the pages that matter most: home, main services, contact and the key areas you serve. You can add more pages after launch, as long as the structure is planned for them.
- How long does a French Press Labs website take?
A typical marketing site takes 4 to 6 weeks. Larger sites with many service and city pages, or custom integrations, take longer. The timeline is set in writing before work starts.